Structural & Working Drawings in India
Working drawings turn a nice plan into a buildable one. Our set covers centre-line and footing layout, column and beam details, slab reinforcement, electrical points, plumbing and drainage, doors and windows, so your contractor does not guess on site.
What you get
- Centre-line plan and foundation layout
- Column, beam and slab details prepared by a structural engineer
- Electrical layout with switch and point positions
- Plumbing, drainage and septic tank/soak pit layout
- Door-window schedule and section drawings
- PDF for site use and DWG for your engineer
Structural & Working Drawings — FAQs
Are these drawings enough for municipal approval?
They are construction drawings. For sanction we can prepare the plan sheet in your local authority's format, subject to its rules.
How long do working drawings take?
Typically 7 to 10 days after the floor plan is final.
Do I need a separate structural engineer?
Our structural drawings are prepared by an engineer. Your site engineer can use them directly and ask us for clarifications.
Other Services
Floor Plan Design · 3D Front Elevation Design · Vastu Consultation · Interior Design · Construction Cost Estimation