Before you build, ask your architect which drawings you will receive, who designs the structure, which approvals apply, how the estimate is built and who supervises the work. A concept floor plan, such as the one BuildMyPlan.in emails you, is only a starting point for that conversation, never a construction document.

What to bring to the first meeting

Bring the items below, and say clearly that any concept floor plan is a starting point, not a design. Expect questions in return about your family, routine, budget and plot, and expect that conversation to change the plan.

  • Plot papers and a measured sketch with dimensions in feet.
  • The rooms you need, split into must-have and nice-to-have.
  • A rough budget and the date you hope to move in.
  • Your BuildMyPlan floor plan sheet, if you have one, as a brief.
  • Photos of the plot, the road in front and the buildings next door.

Drawings: what will you actually receive?

A concept plan is one picture. A build needs a full set, so ask exactly what the fee covers.

  • Which sets are included: floor plans, elevations, sections, structural, electrical and plumbing layouts?
  • Will wall thicknesses and room dimensions be shown on the working drawings?
  • How many rounds of changes does the fee cover?
  • Will I get printed signed sets and editable files?
  • Are door, window and ventilator sizes and positions marked?
  • Who coordinates the structural, electrical and plumbing drawings with each other?

Structure and safety

Walls, columns, beams and foundation decide whether the house stands safely for decades, so ask about them before the layout is final.

  • Who is the structural engineer, and are their drawings in the fee?
  • Has the soil been tested, and what foundation do you recommend?
  • Is the structure designed for a future floor if I want one?
  • Where do columns and beams fall, and do they cut into rooms?
  • Which materials and steel grades will the drawings specify?
  • How will rain-water and drainage be handled around the foundation?

Approvals and by-laws

Rules vary by city, so ask for answers specific to your plot and confirm them with the local authority.

  • Which setbacks, ground coverage and FAR apply to my plot?
  • Which approvals are needed, and who files them?
  • How long does sanction usually take here?
  • What happens if the built house differs from the sanctioned drawings?
  • Do the compound wall, borewell and any tree cutting need separate permission?
  • Which documents should I keep for a later loan or registration?

Estimates, contracts and payments

A clear estimate protects both sides. Ask to see how the number was built, not just the total.

  • Is the estimate a per sq ft rate or an itemised list?
  • Which items are excluded, such as interiors, compound wall and borewell?
  • How are variations and extra work priced?
  • Are payments tied to stages of completed work?
  • Is the price based on the final drawings or on a draft?
  • What will changes after work starts cost?

Supervision, handover and where a concept plan stops

Good drawings still need good supervision on site, so ask who watches the work once the drawings are signed off.

A concept floor plan cannot answer any of these questions. Its sizes are planning figures, and it cannot be used for construction, approval, registration or loan papers, which is why the disclaimer asks you to consult a licensed professional first.

Write every answer down. If two professionals answer the same question differently, ask each to explain why, and ask to see a finished house they have built.

  • How often will you or your engineer visit the site, and will visits be reported in writing?
  • Who checks reinforcement and pipework before they are covered?
  • What defect period applies after handover?
  • Which documents, such as completion papers and as-built drawings, do I receive at handover?

Questions and answers

Should I show my architect my BuildMyPlan floor plan?

Yes, as a brief. It shows the rooms, sizes and Vastu preferences you have in mind. The architect will check every dimension and may redraw the layout.

When should I hire an architect?

Ideally before you commit to a plot, because setbacks and buildable area decide what you can build. At the latest, hire before any construction starts.

Can I start construction from a concept plan?

No. Construction needs drawings prepared by a licensed professional, and sanction where your city requires it. A concept plan is only a starting point.